Document Details Back to Library
Table 8.1_Revised_Facility_Plan_for_Water_Project_and_Bond_03_23_2026.png
- Description
- Table 8.1 for Changes to the Bond Project Plan
- Note
- This image is the table 8.1 that shows some, but not all, changes to the original plan, and shows that even though the core project has been removed, the cost has stayed the same.
- Uploaded
- 3/23/2026 5:14 PM
- File Size
- 151 KB
- Content Type
- image/png
No page previews available.