Document Workspace Back to Library

Document Details
File Name
Table 8.1_Revised_Facility_Plan_for_Water_Project_and_Bond_03_23_2026.png
Description
Table 8.1 for Changes to the Bond Project Plan
Note
This image is the table 8.1 that shows some, but not all, changes to the original plan, and shows that even though the core project has been removed, the cost has stayed the same.
Uploaded
3/23/2026 5:14 PM
Size
151 KB
Content Type
image/png
Download
Page Previews

No page previews available.